The offshore decommissioning wave

As oil and gas fields age, decommissioning is becoming a steady multi-billion-dollar market. Where the work is, and what drives its timing.

Shan VahoraShan Vahora, FounderPublished Oct 20267 min read

~US$6B a year

Global offshore decommissioning spend (SVZK analysis of Rystad Energy data, 2023)

The short answer

Decommissioning old offshore oil and gas infrastructure has become a steady global market worth about US$6 billion a year in our analysis, with well plugging activity rising this decade. Timing depends heavily on oil prices and on operators' incentive to delay, so planning and regulation matter as much as geology.

~US$6B

global offshore decommissioning spend each year (SVZK analysis, Rystad data)

~600

wells a year expected to be plugged and abandoned by 2029

19%

share of UK offshore spending expected to go to decommissioning by 2031 (OEUK)

Why is decommissioning growing?

Every oil and gas field reaches a point where production no longer covers operating costs. At that point, wells must be plugged and abandoned, platforms and subsea equipment removed, and sites cleared. Many fields developed in the 1970s, 1980s and 1990s are now reaching that point, and the energy transition is accelerating the timeline for others.

Our 2023 market review, based largely on Rystad Energy data, put global offshore decommissioning spend at about US$6 billion a year, with around 600 wells a year expected to be plugged and abandoned by 2029.

What does decommissioning involve?

  • Well plugging and abandonment: sealing wells permanently so hydrocarbons cannot escape. This is often the largest single cost.
  • Topsides and jacket removal: lifting and transporting platform structures to shore for recycling or disposal.
  • Subsea infrastructure: pipelines, manifolds and risers, which may be removed or, in some cases, left in place under strict conditions.
  • Site remediation and monitoring: clearing the seabed and monitoring the site after work is complete.

Each step requires specialist vessels, engineering and regulatory approvals, which is why planning years ahead pays off. Operators that bundle several fields or wells into a single campaign can share vessel mobilisation costs and learn as they go, which can cut costs materially compared with one-off projects.

Why do operators delay?

Decommissioning is pure cost for an operator. Delaying it reduces its present value, and every extra year of production adds revenue. That creates a strong incentive to postpone, which is why regulators increasingly set firm expectations and financial assurance requirements.

Oil prices matter too, and in a counter-intuitive way. Industry analysis has found that a low oil price scenario brings decommissioning forward sharply, by around a fifth compared with the base case, because more fields become uneconomic sooner. High prices delay it only modestly.

Where is the work?

  • North Sea: the most mature market. The UK accounts for most of the region's well decommissioning, and decommissioning's share of UK offshore spending is expected to rise from about a tenth in 2021 to around 19% by 2031.
  • Gulf of Mexico: a large, fragmented shallow-water market with many small operators, plus federal funding to plug orphan wells where no owner can be found.
  • Latin America: Brazil's national oil company holds the largest liabilities in the region, with Mexico also carrying major commitments.
  • Australia: a smaller but growing market. The Gippsland Basin in Bass Strait is the largest near-term opportunity, and regulators have tightened expectations after high-profile cases.

Australia also shows what happens when an operator fails. After the operator of the Northern Endeavour floating production facility went into liquidation, the Commonwealth took responsibility for decommissioning and introduced a levy on industry to recover the cost. Regulators have since tightened their scrutiny of titleholders' financial capacity.

Some infrastructure may also find a second life. Depleted fields and existing pipelines are being assessed for carbon storage in several basins, and some platforms could support offshore wind or hydrogen projects. Reuse can delay or reduce decommissioning costs, but only where the engineering and economics stack up.

What does this mean for leaders?

  • Operators: planning early reduces cost and risk. Late, rushed campaigns compete for scarce vessels and crews.
  • Engineering and service firms: decommissioning is a long, steady pipeline. Planning, environmental approvals, well engineering and project management are in demand.
  • Governments: clear rules and financial assurance protect taxpayers from inheriting liabilities.

Figures in this article come from our 2023 review and move with oil prices and operator plans. The direction of travel, however, is clear: decommissioning is becoming a permanent part of the energy industry's work.

Frequently asked

Is decommissioning linked to the energy transition?

Yes. As fields close and investment shifts to low-carbon energy, decommissioning grows, and some infrastructure may be reused for carbon storage or offshore wind.

How big is Australia's market?

Smaller than the North Sea or Gulf of Mexico, but significant, with major liabilities concentrated in a few basins.

Who pays if an operator fails?

Rules vary by country. In many jurisdictions previous owners can be held liable, and in Australia the government has recovered costs through an industry levy. Regulators increasingly require financial assurance up front.

Sources

  1. SVZK Consulting, Global Decommissioning Market review, February 2023 (based on Rystad Energy data)
  2. Offshore Energies UK, Decommissioning Insight 2022
  3. IHS Markit decommissioning price sensitivity analysis
Shan Vahora

About the author

Shan Vahora is the founder of SVZK Consulting. He advises leaders in infrastructure, energy and financial services on growth, M&A and market strategy, and previously worked at Strategy& (PwC), Cardno and Caterpillar. More about Shan

Transmission tower at sunset

Related case study

The global transmission outlook for a network operator's board

Aerial view of wetlands and river channels

Next insight

Carbon accounting: from annual report to operating system

Transmission tower at sunset

Related service

How do we position for the energy transition?

Sizing an energy market? Let's build the evidence.

Tell us the decision you are facing. You will get a short proposal with a firm estimate within 3 business days.

Request a proposalOr book a 30-minute call